← All project examples

GREENFIELD · POLAND

From greenfield to a high-performing automotive supply plant.

Development and successful ramp-up of an injection moulding plant with extensive in-house manufacturing within 18 months.

14months to break-even
18months to full capacity
GreenBalanced Scorecard
My rolePlant development and ramp-up responsibility

01 / Context

The assignment

A new automotive supply plant for an international automotive manufacturer was established in Poland, with an integrated manufacturing chain from injection moulding to shipping.

02 / Responsibility

My contribution

I was responsible for the greenfield development and ramp-up of the plant. Its manufacturing scope included injection moulding, metallisation, assembly, testing and shipping, requiring coordinated development across the entire site.

03 / Outcome

What was achieved

The plant was successfully ramped up within 18 months and positioned as a high-performing top supplier.

This account describes my personal professional experience. Naming a company does not imply endorsement of, or an engagement with, KPI Industrial Transformation.

The next step

Your situation deserves
a clear conversation.

We discuss your situation, the action needed and whether my experience fits your assignment. Personally and confidentially.

Arrange an introductory call